Skip to content

Time tracking

Log time on tasks, correct entries, and start or stop your timer with pf.

Log time on tasks and run a timer. These commands need the time:read and time:write scopes, and time tracking must be on for the workspace.

pf time listList time entries. Shows your own entries unless you filter by task, project, or person

alias: pf time ls

Options

  • --taskstring

    Everyone's entries on this task (ID, identifier, or number)

  • --projectstring

    Everyone's entries in this project

  • --userstring

    One person's entries

  • --fromdate

    Entries on or after this date (YYYY-MM-DD or ISO timestamp)

  • --todate

    Entries on or before this date. A plain date includes that whole day

  • --limitnumber

    Page size, 1 to 100 (default 50)

  • --cursorstring

    Cursor from the previous page

Example

Shell
pf time list --from 2026-09-21 --to 2026-09-27
pf time list --task ENG-124 --json
pf time addLog time on a task

alias: pf time log

Options

  • --taskstringrequired

    Task ID, identifier, or number

  • --durationstringrequired

    Time spent, such as 90m, 1h30m, 1.5h, or 45s; up to 24 hours

  • --datedate

    When the work happened (default now)

  • --notestring

    Note, 500 characters or less

Example

Shell
pf time add --task ENG-124 --duration 1h30m --note "Review pass"
pf time edit <id>Change an entry's duration, date, or note. Only the person who logged it or a workspace owner or admin can change it

Options

  • --durationstring

    New duration, such as 45m or 2h

  • --datedate

    New date (YYYY-MM-DD or ISO timestamp)

  • --notestring

    New note

  • --clear-noteboolean

    Remove the note

Example

Shell
pf time edit <entry-id> --duration 45m
pf time view <id>Show one time entry

alias: pf time show

Example

Shell
pf time view <entry-id>
pf time delete <id>Delete one time entry

alias: pf time rm

Options

  • --confirmboolean

    Delete without a prompt

  • --dry-runboolean

    Preview the deletion without making changes

Example

Shell
pf time delete <entry-id> --dry-run
pf time delete <entry-id> --confirm
pf time startStart your timer on a task. You have one running timer at a time

Options

  • --taskstringrequired

    Task to time (ID, identifier, or number)

Example

Shell
pf time start --task ENG-124
pf time stopStop your timer and log the elapsed time as an entry

Options

  • --expected-timer-idstring

    Only change this timer; returns a conflict if it changed or stopped

  • --notestring

    Note for the entry

  • --durationstring

    Log less than the elapsed time, such as 45m

Example

Shell
pf time stop --note "Pairing session"
pf time statusShow your running timer

Example

Shell
pf time status
pf time switch <task>Stop your running timer, log its time, and start a timer on another task in one step. Switching to the task already being timed changes nothing

Options

  • --expected-timer-idstring

    Only change this timer; returns a conflict if it changed or stopped

Example

Shell
pf time switch ENG-125

Fails with a conflict when your running timer is in another workspace. Stop it there first.

pf time task <task>Show the time tracked on a task: its own time, its subtasks, the estimate, who is timing it, and who logged time. Needs the tasks:read and time:read scopes

Example

Shell
pf time task ENG-124
pf time task ENG-124 --json
pf time summaryTotal logged time over a date range, grouped by day, task, or person. Covers the last 30 days by default and up to 90. With neither --task nor --project, it counts one person's time: yours unless you pass --user

Options

  • --group-bystring

    day (default), task, or user

  • --taskstring

    Everyone's time on this task (ID, identifier, or number)

  • --projectstring

    Everyone's time in this project

  • --userstring

    This person's time

  • --fromdate

    Start of the range (YYYY-MM-DD or ISO timestamp)

  • --todate

    End of the range. A plain date includes the whole day

  • --timezonestring

    IANA time zone name for day grouping, such as America/Chicago (default UTC)

Example

Shell
pf time summary --from 2026-09-01 --to 2026-09-30
pf time summary --project <project-id> --group-by user
pf time summary --task ENG-124 --group-by day --timezone America/Chicago

Totals are partial when more than 5000 entries match; the command prints a note. Narrow the range to see them all.

pf time duplicate <entry>Log a copy of a time entry for yourself, on the same task with the same duration

Options

  • --datedate

    When the work happened (default now)

  • --notestring

    Note (default: the original's)

  • --idempotency-keystring

    Retry-safe request key. Running the command again with the same key returns the first copy

Example

Shell
pf time duplicate <entry-id>
pf time duplicate <entry-id> --date 2026-09-22 --note "Same again"
pf time bulk-add <task>Log the same duration on a task on several dates. All entries are logged or none

Options

  • --durationstringrequired

    Time spent on each date, such as 90m, 1h30m, or 1.5h; up to 24 hours

  • --datesstringrequired

    Comma-separated dates (YYYY-MM-DD or ISO timestamp), up to 100, none repeated

  • --notestring

    Note for every entry, 500 characters or less

  • --idempotency-keystring

    Retry-safe request key. Running the command again with the same key returns the first result

Example

Shell
pf time bulk-add ENG-124 --duration 30m --dates 2026-09-21,2026-09-22,2026-09-23 --note "Standup"
pf time bulk-duplicate <entryIds...>Log copies of several time entries on one date. Pass up to 100 entry IDs, separated by spaces or commas, on at most 10 tasks. All copies are logged or none

Options

  • --datedaterequired

    When the work happened (YYYY-MM-DD or ISO timestamp)

  • --notestring

    Note for every copy (default: each original's)

  • --idempotency-keystring

    Retry-safe request key. Running the command again with the same key returns the first result

Example

Shell
pf time bulk-duplicate <entry-id-1> <entry-id-2> --date 2026-09-22
pf time bulk-duplicate <entry-id-1>,<entry-id-2> --date 2026-09-22 --note "Carried over"

Fix time tracking problems

A time command returns 403
Listing needs time:read. Logging, editing, and timers need time:write. If the error says time tracking is turned off, a workspace admin must turn it back on before you can log time. A running timer can still be stopped.
A timer does not start
You can run one timer at a time. Run pf time status, then pf time stop before starting another.

Next steps

Image preview
100%